In this chapter I will make the sides of the fuselage.
Step 1. Cutting the jigs and laminating the top longerons
Step 2. Building the forms for the fuselage sides and preparing the sides for contouring
Step 3. Contouring the insides
Step 4. Inside layup and installing the upper longerons
Step 5. Installation of lower triangular longerons
Step 6. Completion of the fuselage sides
Time used this chapter: 36:00 hours
Started: 2009-07-14
Ended: 2009-09-07